A proposed embankment fill requires 7500 m³ of compacted soil. The void ratio of the compacted fill is specified as 0.7. Soil can be transported from one of the four borrow pits, as described in the following table. The void ratio, specific gravity of soil solids, and the cost per cubic meter for moving the soil to the proposed construction site are provided in the table. Determine the volume of each borrow pit soil required to meet the specification of the embankment site. b. Make the necessary calculations to select the borrow pit which would be most cost-effective. а. Borrow pit Void ratio G, Cost ($/m³) I 0.85 2.66 11 II 0.92 2.69 8 III 1.21 2.71 IV 0.89 2.73 10

Principles of Geotechnical Engineering (MindTap Course List)
9th Edition
ISBN:9781305970939
Author:Braja M. Das, Khaled Sobhan
Publisher:Braja M. Das, Khaled Sobhan
Chapter2: Origin Of Soil And Grain Size
Section: Chapter Questions
Problem 2.12P: Repeat Problem 2.11 with the following data. 2.11 The grain-size characteristics of a soil are given...
icon
Related questions
Question
Problem 3:
A proposed embankment fill requires 7500 m³ of compacted soil. The void ratio of the compacted fill is
specified as 0.7. Soil can be transported from one of the four borrow pits, as described in the following table.
The void ratio, specific gravity of soil solids, and the cost per cubic meter for moving the soil to the proposed
construction site are provided in the table.
a. Determine the volume of each borrow pit soil required to meet the specification of the embankment site.
b. Make the necessary calculations to select the borrow pit which would be most cost-effective.
Borrow pit
Void ratio
G,
Cost ($/m³)
I
0.85
2.66
11
II
0.92
2.69
8
III
1.21
2.71
9.
IV
0.89
2.73
10
Transcribed Image Text:Problem 3: A proposed embankment fill requires 7500 m³ of compacted soil. The void ratio of the compacted fill is specified as 0.7. Soil can be transported from one of the four borrow pits, as described in the following table. The void ratio, specific gravity of soil solids, and the cost per cubic meter for moving the soil to the proposed construction site are provided in the table. a. Determine the volume of each borrow pit soil required to meet the specification of the embankment site. b. Make the necessary calculations to select the borrow pit which would be most cost-effective. Borrow pit Void ratio G, Cost ($/m³) I 0.85 2.66 11 II 0.92 2.69 8 III 1.21 2.71 9. IV 0.89 2.73 10
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 5 steps

Blurred answer
Knowledge Booster
Pricing excavation and backfill
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Principles of Geotechnical Engineering (MindTap C…
Principles of Geotechnical Engineering (MindTap C…
Civil Engineering
ISBN:
9781305970939
Author:
Braja M. Das, Khaled Sobhan
Publisher:
Cengage Learning
Fundamentals of Geotechnical Engineering (MindTap…
Fundamentals of Geotechnical Engineering (MindTap…
Civil Engineering
ISBN:
9781305635180
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning