Draw a product structure and a indexed bill of materials for the following product: the final product 'A' consists of a subassembly 'B' and two subassemblies 'C'. Subassembly 'B' consists of one component 'D' and two components 'E'. Subassembly 'C' consists of one component 'E', one 'F', and two 'G'.
Q: An objective function and a system of linear inequalities representing constraints are given.…
A: Here, I am given the objective function and a system of linear inequalities, First, I will formulate…
Q: What are the challenges associated with scaling up a prototype to mass production, and how can they…
A: Scaling up a prototype to mass display can be a complex and challenging process. While a prototype…
Q: How does the Wilson approach differ from traditional project management methodologies?
A: The Wilson approach, also known as the Economic Order Quantity (EOQ) model, is primarily an…
Q: orecasted demand for the week of August 31 a 350 and 0.30 using exponential smoothing develop the…
A: Exponential smoothing is a method of forecasting which takes into consideration the previous year's…
Q: Describe the process of IT resource acquisition in an organization, including the key steps and…
A: The process of IT resource acquisition in an organization includes acquiring the required…
Q: How does a business impact analysis contribute to the development of a continuity plan?
A: A Business Impact Analysis (BIA) is a critical component in the development of a continuity plan for…
Q: A business student has $2,500 available from a summer job and has identified three potential stocks…
A: Amount available for investment = $2500 ABCPrice/share$12$15$30Return/share$8$7$11
Q: Gorsuch Law Firm has two paralegals. Customers arrive randomly at an average rate of 8 customers per…
A: Queuing theory Is about the mathematical study of of waiting lines, or queues. Variability can…
Q: Processing time for eight projects, displayed in the sequence they arrived. Project P1 P2 P3 P4 P5…
A: Find the given details:
Q: When all activities are completed in normal time, what is the critical path? When all activities are…
A: The method of critical path is applied in various industries like logistics, manufacturing, etc. It…
Q: H&M, a Fashion Giant, Has a Problem: $4.3 Billion in Unsold Clothes. This was reported by the New…
A: Inventory management is a critical part of a company's financial landscape, influencing liquidity…
Q: A single cashier handles customers that arrive at a bakery. About 34.8 customers come into the…
A: Find the given details below:
Q: Professor Herman compares the “standard” frame of diversity, equity, and inclusion with the…
A: Professor Herman believes that the main components of the traditional frame of diversity, equality,…
Q: Kellam Images prints snack food bags on long rolls of plastic film. The plant operates 250 days a…
A:
Q: How can businesses ensure that their continuity plans are compliant with relevant regulations and…
A: In business, continuity plans are strategic frameworks that outline procedures and actions to…
Q: Explain the role of IoT in optimizing supply chain management. Provide an example.
A: The role of IoT or the Internet of Things is quite vital in optimizing supply chain tasks, This IoT…
Q: Determine the capacity efficiency of the shop. O A. The capacity efficiency is 83.75%. OB. The…
A: First, Let me state the given data,for the given data, I will determine the capacity efficiency,
Q: A supply chain manager faced with choosing among four possible locations has assessed each location…
A: Find the given details below: Factor weightLocationCriteria1234Raw material…
Q: Hau Lee Furniture, Inc., spends 50% of its sales dollars in the supply chain and finds its current…
A: Find the given details below:
Q: 5. Develop an MRP spreadsheet record for SIX perl Period Gross requirements Lead time Lot size…
A: Planned order releases help the organization maintain the right level of inventory. By releasing…
Q: Discuss the challenges of scaling up prototyping processes for mass production and the strategies…
A: In order to successfully and financially introduce novel items to the market, companies must scale…
Q: Microserve provides computer repair service on a contract basis to customers in five sections of the…
A: The location needs to be determined using the Centre of Gravity Method.
Q: Fantasy Park has two service desks, one at each entrance of the park. Customers arrive at each…
A: Note: Since you have posted a question with multiple sub parts, we will provide the…
Q: You are the author of a new novel. You can choose to self-publish by making your own bsite to with…
A:
Q: Explain the importance of conducting a risk assessment as part of a continuity plan.
A: A continuity plan shows how an organization will continue its essential business operations and…
Q: Problem 2 Solve the following problem with any solver or other method (e.g., graphically, LPSolve,…
A: Linear programming is used by the organization to allocate limited resources efficiently. It helps…
Q: Complete the chase production plan, using the following information. The only costs you need to…
A: Note: There is discrepancy in the values to match with final answer. Hence, the solution is provided…
Q: (a) What is the optimal solution, and what are the optimal production quantities? W M profit $ jars…
A: The concept of linear programming is used in the logistics industry as well as the manufacturing…
Q: Describe the process of conducting a business impact analysis (BIA) and its role in developing a…
A: The Business Impact Analysis (BIA) approach is crucial to business continuity planning because it…
Q: How can organizations effectively plan for their storage capacity needs? What factors should be…
A: Effective planning for storage capacity is the critical aspect of the operations management for…
Q: Liam is estimating the schedule for all activities in the GHI Project. He is working with his…
A: Estimating project schedules accurately is a critical aspect of project management. Different…
Q: Evertight, a leading manufacturer of quality nails, produces 1-, 2-, 3-, 4- and 5-inch nails for…
A: No. of 1-inch nails = 651No. of 2- inch nails = 243No. of 3-inch nails = 41No. of 4-inch nails =…
Q: What are the main factors that influence the decision to use the Wilson approach in a supply chain…
A: The supply chain is the network of organizations and people that help in production as well as…
Q: How can organizations adapt the Wilson approach to effectively manage large-scale, multi-team…
A: Effective project management is essential for organisations looking to achieve their objectives and…
Q: In the context of prototyping for complex systems (e.g., aerospace or automotive), discuss the…
A: In the realm of the complex systems like aerospace and automotive, prototyping plays pivotal role in…
Q: Explore the role of technology and data analytics in enhancing the Wilson approach's performance in…
A: The Wilson Approach, also known as the Economic Order Quantity (EOQ) model, has long been used as a…
Q: Patima has relationships with several granite wholesalers. She takes orders for granite from…
A: Business negotiations provide a structured platform that helps an organization resolve conflicts and…
Q: Security clearances (none, confidential, secret, top secret)? Group of answer choices: Nominal…
A: Business information helps the organization in identifying as well as mitigating risks. The risk can…
Q: Explain the Wilson approach in supply chain management and its key objectives.
A: The Economic Order Quantity (EOQ) model, also known as the Wilson approach in supply chain…
Q: What are the key components of a continuity plan for a large-scale enterprise?
A: Business continuity plans help the organization identify the potential risks and vulnerabilities…
Q: Describe the concept of iterative prototyping and its significance in refining product designs.
A: Prototypes are defined as the early model or sample of a product which is meant of sample testing…
Q: Discuss the role of off-site data backup in ensuring business continuity
A: Business continuity ensures that essential business functions can continue even in the face of…
Q: Kolkmeyer Manufacturing Company is considering adding two machines to its manufacturing operation.…
A: Find the Given details below:
Q: What role does employee training play in the successful implementation of a continuity plan?
A: Employee training helps in the successful performance of a continuity plan. When a disturbance…
Q: Explain why services marketing are important to satisfy the customers in a service oriented…
A: Services are intangible offerings that play a very important role in society. Services help in the…
Q: Explain the role of proactive vs. reactive system management strategies in minimizing downtime and…
A: System management strategies play critical role in ensuring reliability and availability of complex…
Q: Explain the key principles of the Wilson approach to supply chain management at an intermediate…
A: Douglas M. Lambert and Martha C. Cooper created the Wilson Approach to supply chain management, a…
Q: Consider the following information. PART X Gross Requirements Scheduled Receipts Projected On-Hand…
A: Planned order releases are an important part of planning the requirement of material and inventory…
Q: A consulting firm has offered their services to do market research to help better understand the…
A: As the organization has to make decisions for its long-term survival, there are different methods…
Q: The diner owner has room for 55 containers of shredded Parmesan cheese. He has 5-oz and 10-oz…
A: The number of 5-oz and 10-oz containers = 55Total cheese = 450 -oz5-oz containers sell for $7 and…
Draw a product structure and a indexed bill of materials for the following product: the final product 'A' consists of a subassembly 'B' and two subassemblies 'C'. Subassembly 'B' consists of one component 'D' and two components 'E'. Subassembly 'C' consists of one component 'E', one 'F', and two 'G'.
Step by step
Solved in 4 steps with 2 images
- Bill of material (BOM) details all the sub-component, material, and parts used to make one product. There is a dinner party at your home of a few guests, and you are managing your kitchen. Develop a BOM of any main dish (main course) of your own choice in a tree format. (Hint: Select number of people that will be served with dinner and quantity of that main course to be prepared in appropriate units) Let us assume that you are managing the complete food for dinner, and the food will be served at 9:00 PM sharp. You have decided to serve one main course item, as mentioned in the previous part (a), one sweet dish of your choice, and salad. Prepare a lead-time tree for your complete project and explain the total lead-time from start preparation to serving the dinner for your guests. Secondly, what is the latest time you must start preparing your dinner?Bill of material (BOM) details all the sub-component, material, and parts used to make one product. There is a dinner party at your home of a few guests, and you are managing your kitchen. Develop a BOM of any main dish (main course) of your own choice in a tree format. (Hint: Select number of people that will be served with dinner and quantity of that main course to be prepared in appropriate units). Units: tea spoon, table spoon, a cup, grams etc.Product A consists of subassemblies B and C. Subassembly B requires two parts of D and one part of E.Subassembly C requires one part of D and one part of F. a. Draw a product structure tree (BOM) for this product. b. How many parts are needed to make 300 units of finished product?
- Bill of material (BOM) details all the sub-component, material, and parts used to make one product. There is a dinner party at your home of a few guests, and you are managing your kitchen. a) Develop a BOM of any main dish (main course) of your own choice in a tree format. (Hint: Select number of people that will be served with dinner and quantity of that main course to be prepared in appropriate units). Units: tea spoon, table spoon, a cup, grams etc. b) Let us assume that you are managing the complete food for dinner, and the food will be served at 8:00 PM sharp. You have decided to serve one main course item, as mentioned in the previous part (a), one sweet dish of your choice, and salad. Prepare a lead-time tree for your complete project and explain the total lead-time from preparing to serving (start to complete) the dinner for your guests. Secondly, what is the latest time you must start preparing your dinner?Bill of material (BOM) details all the sub-component, material, and parts used to make one product. There is a dinner party at your home of a few guests, and you are managing your kitchen. a) Develop a BOM of any main dish (main course) of your own choice in a tree format. (Hint: Select number of people that will be served with dinner and quantity of that main course to be prepared in appropriate units). Units: tea spoon, table spoon, a cup, grams etc. b) Let us assume that you are managing the complete food for dinner, and the food will be served at 8:00 PM sharp. You have decided to serve one main course item, as mentioned in the previous part (a), one sweet dish of your choice, and salad. Prepare a lead-time tree for your complete project and explain the total lead-time from preparing to serving (start to complete) the dinner for your guests. Secondly, what is the latest time you must start preparing your dinner? NOTE: USE MS WORD FOR MAKING TREE CHART. COPY PASTE WORK IS…Product A consists of subassemblies B and C. Subassembly B requires two parts of D and one part of E. Subassembly C requires one part of D and one part of F.a. Draw a product structure tree (BOM) for this product.b. How many parts are needed to make 300 units of finishedproduct?
- As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, 2 springs, and 4 clamps. The base is assembled from 1 clamp and 2 housings. Each clamp has 1 handle and 1 casting. Each housing has 2 bearings and 1 shaft. There is no inventory on hand. A. Design a product structure noting the quantities for each item and show the low-level coding. B. Determine the gross quantities needed of each item if you are to assemble 50 brackets. C. Compute the net quantities if there are 25 of the base and 100 of the clamp in stock.Which core process includes the activities required to produce and deliver the service or product to the external customer? A. supplier relationship process B. order fulfillment process C. customer relationship process D. new service/product development processFour things must be known about material inputs in standard development? A. Type of material needed, quality of materials, quantity needed, and price (cost) per unit B. Material specifications, quantity needed, unit cost, and quality of materials C. unit cost, predetermined cost, material quality, and type of material needed D. actual cost, predetermined cost, material specifications, quantity needed
- The product structure for product X is illustrated below. Level 0 Level 1 4 Level 2 Level 3 Part H B C D H K M N X Z с K B Lead Time (in weeks) 1 1 3 2 3 2 3 3 4 M D N The lead time for manufacturing any number units for an item and the required number of units for the lower level part in the product structure are reported in the following table. For example, each unit of Part X requires 1 units of Part C and, in turn, each unit of Part C requires 2 units of Part H and 2 units of Part K. 2 1 4 2 2 2 4 1 2 Required number of units X Z H K 100 units of product X are to shipped at the end of week 25. There is no inventory on hand. How many units of part N are required for production? 3200 Specify only the number.As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, 2 springs, and 4 clamps. The base is assembled from 1 clamp and 1 housing. Each clamp has 1 handle and 2 castings. Each housing has 1 bearing and 2 shafts. There is no inventory on hand. Part 2 a) Design a product structure noting the quantities for each item and show the low-level coding. Match each number in the structure below with the corresponding item. Number Item I Spring Subscript left parenthesis 2 right parenthesisSpring(2) II Housing Subscript left parenthesis 1 right parenthesisHousing(1) III Casting Subscript left parenthesis 2 right parenthesisCasting(2) IV Shaft Subscript left parenthesis 2 right parenthesisShaft(2) Bracket Base(1) Clamp(1) Handle(1) Clamp(4) Bearing(1) Handle(1) Casting(2) IIIIIIIV Part 3 b) Determine the…Refer to this product tree: A hierarchical diagram that depicts the subassemblies and components that are needed to produce and/or assemble a product P.P requires 2 components of A, 3 components of B and 4 components C. A further requires 3 components of M and 4 components of N. B further requires 4 components of C and 5components of D. If 1000 Ps are needed, and on-hand inventory consists of 200 Ps and 100 each of all other components and subassemblies, how many Cs are needed? Multiple Choice 9200 3200 12300 12200 3100